c0mm0.com — the continuously verified register of European data

Register record·API·FRVERIFIED · checked 22h ago
F

France Mobile indicator - Status and history of fixed DCC and 4G deployments

APINational · France

**Presentation** To ensure effective digital coverage of the territory, the France Mobile Programme aims to provide targeted coverage to the points of interest identified in the context of the New Deal mobile, namely the creation of approximately 5000 4G sites under the Targeted Coverage Scheme (DCC) and 1000 sites under the ‘fixed 4G’ (fixed 4G) coverage extension scheme. Under this DCC scheme, each operator is required to install 5,000 new sites (some of which can be shared), at a rate of 600 to 800 sites per year. These sites are identified by the territories, within the framework of local project teams chaired by the Prefect of the Department (or region) and the President of the Department (or region) and composed of representatives of the prefectures of the regions, the presidents of the EPCIs, associations of local authorities (mayors and rural mayors) and the project leader of the public initiative networks of the Plan France Très Haut Débit. Operators must cover the area in voice, SMS and 4G Internet, at the latest within 24 months of the publication of the decree setting out the list of sites to be covered. The objective of the fixed 4G coverage extension device is to ensure good broadband coverage in uncovered or poorly covered areas. Orange and SFR have an obligation to install 500 new sites each. Once an area has been selected and published in a ministerial order, operators have a maximum of 24 months to provide the expected coverage (‘fixed 4G’ internet access). The Government has identified the 1000 fixed target 4G sites through 4 decrees published in 2019, 2020, 2021 and 2023. **Data** This indicator shows, for each department, the history of the number of 4G mobile sites that have been the subject of a ministerial order and their commissioning under the targeted coverage scheme (DCC) and the fixed 4G scheme of the New Deal Mobile since the beginning of the scheme. The ministerial orders are prepared by the French Mobile Programme of the ANCT on th.

digitalboundariesgovernment
0
fair

Composite of 5 axes from our methodology (proof-based officialness, live verification, metadata completeness, license clarity, agent readiness).

  • Officialnessweight 25%50/100

    Not public-sector → neutral score; not subject to the proof checker.

  • Availabilityweight 25%100/100

    Latest verification succeeded.

  • Metadata completenessweight 20%50/100

    3 of 6 recommended metadata fields populated.

  • License clarityweight 15%50/100

    License info not yet tracked for APIs (datasets only).

  • Agent readinessweight 15%10/100

    Topic tags assigned

Data access

No machine-readable schema

This entry links to a dataset, file download, or documentation page rather than a self-describing API, so there's no field schema to display.

Verification Status

Machine-readable & source

France Mobile indicator - Status and history of fixed DCC and 4G deployments — live verification badge

Embed this badge in a README or wiki — it always shows the latest verification state and quality tier.